After 3 years of no baths the work started...
This isn't quite the 'before picture' as this is the start of the destruction I can't find any of those pictures as it was too hideous for us to photograph. Here the flower embossed pink bath,pink loo (with white seat) and pink seat have been removed. There are still many layers of slimy lino to go though! Strangely enough the bath was stolen out of the skip - I like to think it found a home elsewhere with some pink loving type rather than as scrap metal.
This still looks like early days but has already seen a new ceiling, joist reinforcements (noggins - my new word for 2013) lots of boarding, plumbing and electrics. Plus as soon as we laid the first tile the floor sagged in the middle and had to redone to correct a 4.5cm difference!
The walls were a little more straightforward...
There just seemed rather a lot of them! We left gaps for 3 strips of bronze mosiac tiles - 1 either side of the sink and one in the middle of the shower to look arty but ended up with loads of extra trouble as they turned out to be a different thickness.
The boys meanwhile had to find alternative ways of washing!
Et voila!
I finally I had my first bath in this house on 7th April 2013 - no no champagne accompanied it (probably because I was too busy listening for leaks!). The only problem now is Tris is calling this 'his' bathroom and has started demanding a ticket to use it!